Text us a photo (657) 650-6111
Finished projects Acrylic Materials Tub-to-Shower Tub-to-Tub California Bath Walk-in Tubs Reviews Free Estimate Call (657) 650-6111 Text us a photo

Case study · Anaheim · 09/12/2026

Anaheim: tub out, walk-in shower in.

Anaheim bathroom before: an old tub alcove with a gold-framed glass door
What we started with: the old tub and its gold-framed sliding door, ready to come out.
Anaheim bathroom after: a low step-in shower with a black stone base, sliding glass door and grab bars
After: the black stone base is the first thing you notice.

From our side, the black stone base is what makes this bathroom: it gives the room a look the old tub never had. In a small bathroom shared with the toilet and vanity, we kept the same footprint and built the shower around that base.

The old tub and its gold-framed door are gone. Now there are grab bars right there and a sliding glass door. The toilet, vanity and window stayed where they were, so nothing else had to change.

Warranty

Limited lifetime warranty on the shower base and wall materials, plus a 10-year workmanship warranty. For the original homeowner; not transferable.

More: Bathroom remodeling in Anaheim · Tub-to-shower conversions · All finished projects

Get a free in-home estimate Call (657) 650-6111

Last updated: October 2026

Free estimate Call (657) 650-6111 Text us a photo