Stanton · Orange County
Stanton bathroom remodeling and tub-to-shower conversions
Shower and tub updates for Stanton homes.
Free in-home visit, written price the same day, no salesperson, you meet the installer.

Stanton at a glance
Stanton homes and their bathrooms.
Most Stanton homes, about 61%, were built in the 1950s to 1970s. If your bathroom still has its original tub, we can replace it with a walk-in shower, often in a day.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (year structure built), checked 10/22/2026.
How a Stanton estimate works
- 01
Call or send the form.
Monday–Saturday, 7am–7pm. Sunday closed.
- 02
We come to your house.
We measure, bring samples and give you a written price. Most visits take under an hour.
- 03
You get a written price.
Estimates are free and happen in your house, not a showroom.
Stanton estimate: (657) 650-6111
Get a free estimate →What we do
What that means for a Stanton bathroom.
Stanton inspections must be scheduled at least 48 hours ahead, so we book them early in the job.
We work all over the county, too. See bathroom remodel in Orange County.
Wall options: Full Wall Acrylic Panel, Palisade Tile, laminate and synthetic stone, over an acrylic shower base or tub. See materials →
Stanton questions
What does a tub-to-shower conversion cost in Stanton?
Tub-to-shower conversions and tub replacements start at $10,000. Full bathroom remodels are quoted per project. We accept cards, PayPal, Venmo, Zelle, bank transfer/eCheck, wire and checks.
What warranty comes with a new shower?
Limited lifetime warranty on the shower base and wall materials, plus a 10-year workmanship warranty. For the original homeowner; not transferable.
How long does the work take?
Jobs often finish in a day once materials are on site. Hidden rot can take longer. Why we open the walls
Do you install over my existing tile?
Usually no. Demo to the studs is the usual method. Overlay is rare. See wall materials
Who issues bathroom permits in Stanton?
The City of Stanton Building Division, (714) 890-4286. We pull what's required for your job and tell you on the visit.
How long does a Stanton plan check take?
For most projects, Stanton gives a 10 business day turnaround for the first review and 5 business days for a second review. Business days are Monday through Thursday.
Stanton estimate: (657) 650-6111
Get a free estimate →Stanton permits
Permits in Stanton: the Building Division.
- Stanton City Hall is at 7800 Katella Avenue; the Building Division's permit line is (714) 890-4286.
- For most projects, the first plan check review takes 10 business days and a second review takes 5; business days are Monday through Thursday.
- Inspections are conducted Monday through Thursday, 9 a.m. to 4 p.m., and must be scheduled at least 48 hours in advance.
- Contractors need a Stanton business license, and so do their subcontractors.
CA Lic. B & C-36 #1139422.
Source: City of Stanton (Building Division page · Building & Safety FAQ), checked 10/22/2026.
Keep reading
Read next: Shower seats and grab bars · Aging in place